October 05, 2026
GRANT COUNTY PORT DISTRICT NO. 1
NOTICE TO CONSULTANTS FOR INDUSTRIAL PARK
NO. 4 RAIL INFRASTRUCTURE EXPANSION
CONSTRUCTION ENGINEERING SERVICES
ADDENDUM NO. 1
Notice is hereby given on behalf of the President of the Port
Commission of Port District No. 1 of Grant County (Port of Quincy)
that the deadline for submission of Statements of Qualifications is
hereby extended from 5:00 p.m. Pacific Time on October 6, 2026
to 5:00 p.m. Pacific Time on October 23, 2026.
All other terms, conditions, and requirements of the Request for
Qualifications remain unchanged
PORT DISTRICT NO. 1 OF GRANT COUNTY, WASHINGTON
CURT A. MORRIS, CHAIRMAN
BOARD OF COMMISSIONERS
101 F Street SW ⬧ Quincy, WA 98848 ⬧ 509-787-3715 ⬧
- Approximately 5,986 track feet of new 136-pound rail on concrete ties with ballast; three No. 9 turnouts; removal and reuse of existing track; and related trackwork.
- Track embankment, subexcavation, granular embankment, subballast, and associated earthwork.
- A 36-foot-long, 10-foot by 4-foot precast concrete box culvert; storm pipe, manhole, and drainage structure work; and drainage and utility protection.
- Road ‘O’ grading and preparation for a future at-grade crossing; an in-yard concrete grade crossing; pavement restoration; markings, signage, and fencing work.
- Construction within an active intermodal rail facility, including railroad coordination, work windows, and work associated with the Quincy-Columbia Basin Irrigation District ditch.
- Preconstruction coordination; review of schedules, submittal logs, and establishment of project administration and recordkeeping procedures.
- Resident engineering and construction observation sufficient to document conformance with the Contract Documents, including daily reports, photographs, measurements, quantity records, and documentation of concealed work.
- Administration of requests for information, submittals and shop drawings, field directives, change orders, schedule updates, weekly progress meetings, progress payment estimates, disputes, and claims support.
- Review and documentation of contractor quality control, testing, material certifications, rail records, and compliance with applicable Contract requirements.
- Coordination with the Port and other affected parties regarding project status.
- Administration and documentation of applicable federal and state construction requirements.
- Substantial, Physical, and Final Completion inspections; punch lists; review of record drawings and closeout submittals; final quantities and payment; and project closeout support.
SOQs will be scored evaluated using the following criteria (100 points):
- Qualifications, relevant experience, and key personnel (25 points)
- Firm and team experience providing construction engineering for similar projects. (15 points)
- Experience administering FRA or other federally funded construction contracts, including grant documentation, Buy America/BABA, Davis-Bacon, and federal recordkeeping requirements. (10 points)
- Familiarity with project requirements, (20 points)
- Ability to meet the anticipated construction schedule and provide appropriate field coverage. (15 points)
- Past performance and references. (15 points)
Americans with Disabilities Act (ADA) Information
Dates of publication in the COLUMBIA BASIN HERLAD: September 14, 2026 and September 21, 2026.